|
Still deciding? Get samples of $ !
Order Sample
|
| Customization: | Available |
|---|---|
| After-sales Service: | 1 Year |
| Automatic Grade: | Full-Automatic |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Steel Clip Reinforced PVC Film Lamination HVAC Air Duct Making Machine for Chimney Tube
Canvas soft joint is a fibrous connection material used between air ducts, air ducts and equipment, and air ducts and air outlets. Its purpose is also to reduce the vibration of the air duct or equipment, eliminate vibration, and effectively fix it. Any equipment that vibrates during operation and needs to be connected to pipes (whether water pipes or air ducts) needs to use flexible connections to prevent vibrations from being transmitted to the user side through the pipes.
| No. | Item | Specification |
| 1 | Diameter range | 100mm~600mm |
| 2 | Length of flexible duct | Unlimited |
| 3 | Material specification | PVC film, 60-100mm wide, 0.2-0.3mm thick; Metal clip: Hot-dip galvanized steel strip, 11mm wide, 0.4-0.5mm |
| 4 | Spiral pitch | 15-20mm less than width. |
| 5 | Strip feeding speed | up to 15m/min |
| 6 | Duct forming speed | about 1000m/shift for 150mm diameter |
| 7 | Motor power | 2.2KW |
| 8 | Dimension | 2200 X 650 X 1200mm |

1. Q: What is the power supply of the machine?
A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.
2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.
5. Q: What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.