Customization: | Available |
---|---|
After-sales Service: | Free |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 1/Set
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Summary
1. This machine is composed of automatic loading and unloading device, manipulator mobile grab device, pull pipe mechanism, positioning mechanism, saw head mechanism, pneumatic system and electronic control system. 2, automatic loading and unloading device: by manual to the V-shaped groove one by one discharging, a maximum discharging (pipe) 300, feeding by cylinder + linear guide drive, the use of manipulator grab feeding. Unloading by manipulator grab unloading. 3, mechanical mobile grasping device: a total of 4 manipulator grasping position, the use of cylinder control manipulator vertical, horizontal movement, the manipulator in turn from the alignment of the feeding device to take material, into the next station, product processing after the completion of the manipulator again out and put in the turnover box. 4. Pipe pulling mechanism: this mechanism is composed of pneumatic clamping mechanism, hydraulic pipe pulling mechanism, pipe die base, guide rod, linear bearing, floating positioning mechanism, and feeding and discharging cylinder. The first location after feeding on preliminary positioning fitting, by the manipulator grasping, into the second station drawn tube floating positioning within the V groove, the cylinder will be at the end of the pipe head forward, through the mould, will head into the fixture, by cylinder clamping, laguan cylinder driven mold, mold together movement to a certain position, distance, controlled by travel switch cylinder return at this time, fixture on the side of a cylinder, will launch mold forming of pipe fittings, manipulator crawl into the third station positioning. 5. Positioning mechanism: because the pipe fittings elongate after stretching and become thinner in diameter, it is necessary to readjust and position the workpiece at this station. This station is provided with positioning backer and pushing cylinder. 6, saw head mechanism: this mechanism is mainly composed of fixture, cutting motor, cutting motor is installed under the linear guide rail, can move left and right, driven by the cylinder, front and rear is provided with dovet-tail slide and adjusting screw, easy to adjust. After positioning, the pipe fitting is grabbed by the manipulator and transferred to the saw head clamp. The pipe fitting is clamped. The cutting motor is pushed forward by the cylinder and the head of the drawing pipe is sawed off. The processed workpiece is grabbed again by the manipulator and transferred to the feeding groove. At this time, all the processing is completed and the next action cycle is repeated.
Product processing outside diameter | φ6mm-φ8mm |
The length of the product | 100mm-400mm |
Machining efficiency | 700-1000 piece/h |
Total power of equipment | 5.5KW |
Packaging:
Stable wooden package protects machine from strike and damage.
Wound plastic film keeps machine out of damp and corrosion.
Fumigation-free package helps the smooth customs clearance.
The big size machine will be fixed in container without package.
Shipping:
For LCL, we cooperated with reputable logistics team to send machine to sea port speedily and safely.
For FCL, we get the container and do container loading by our skillful workers carefully.
For forwarders, we have professional and long-term cooperated forwarders who can handle the shipment smoothly. Also we would like
to have seamless cooperation with your forwarder at your convenience.
1. Q: What is the power supply of the machine?
A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.
2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.
5. Q: What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.