Customization: | Available |
---|---|
Production Scope: | Parts Production Line |
Condition: | New |
Still deciding? Get samples of US$ 18000/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Bicycle Wheel Rim Making Machine Production Line
This machine is suitable for the production of iron steel rims. It is suitable for the production of bicycles, electric bicycles or tricycle rims. The equipment is easy to adjust and has stable performance. Multi-roll cold bending deformation process is adopted, and special mold materials are used.
NO. | Item | Parameter |
1 | Main motor power | 7.5kW |
2 | Thickness range | 0.8mm-1.5mm |
3 | Diameter of roll bearing | 60mm |
4 | Material of roll | Cr12 quenching |
5 | Maximum forming processing lines | 8 lines |
6 | Control tool | Touch screen |
7 | Control system | PLC |
8 | MAX.Loading capacity of decoiler | 2tons |
9 | MAX.Loading width of decoiler | 300mm |
10 | Cutting system | Hydraulic control |
11 | Material of cutting blade | Cr12 quenching process |
12 | Adjustment level of welding part | stepless adjustment |
13 | Vertical work stroke of welding part | pneumatic |
14 | Motor mount of polishing machine | 4 |
15 | Total motor power | 12kW |
16 | Material of polishing wheel | nylon |
17 | Propulsion method | Pneumatic |
1. Q: What is the power supply of the machine?
A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.
2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.
5. Q: What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.