Customization: | Available |
---|---|
Production Scores: | Single Variety |
Production Continuity: | Continuous |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Fully Automatic Disposable Double-layer Razor Blade Assembly Production Line for Head and Handle Part
The disposable razor production line consists of a cutter head assembly machine, a sliding strip machine, a knife handle assembly machine, and a knife cover assembly machine. The entire production line is fully automated. All machines automatically feed and assemble, and only a small number of workers are required to supplement materials, which greatly reduces labor costs.
No
|
Parameter
|
Data
|
1
|
Dimension
|
1400X1000X1300(mm)
|
2
|
Weight
|
200KG
|
3
|
Power supply
|
220V single-phase AC
|
4
|
Air supply
|
0.6-0.8MP dry gas
|
6
|
control
|
PLC touch screen
|
7
|
Assembly efficiency
|
about 2700 pcs/hour
|
8.
|
Alarm
|
automatic shutdown after alarm
|
9
|
Production information
|
automatic production statistics
|
1. Q: What is the power supply of the machine?
A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.
2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.
5. Q: What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.