Customization: | Available |
---|---|
After-sales Service: | One Year |
Warranty: | One Year |
Still deciding? Get samples of US$ 2000/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
High production efficiency: suitable for large-scale production.
Handled wall thickness and achievable tolerance (required+/-10%), as well as supported wall thickness | Thickness range 1.0~3.0mm |
Producible length | Length range 2-15.5 meters |
Realizable ellipticity accuracy (expected outer diameter of 1.5%) | Welded pipe diameter range 200~600mm Diameter tolerance ± 0.5mm |
Straightness of different lengths (0.025 inches for any 1-foot length and 0.25 inches for any 10 foot length) | 1 foot long 0.1mm, 10 feet long 3mm |
What types of 304L/material properties can the machine support | Can weld stainless steel material (soft state) or carbon steel material (soft state) |
What types of welds can be achieved | This welding pipe machine can use argon arc welding or laser welding |
Approximate pipeline productivity through machines | Argon arc welding at around 1 meter/minute (line speed), laser welding at around 2 meters/minute (line speed) |
How wide coils can this machine accommodate | Strip width 300mm |
A rough schedule of how long it takes to produce and transport machines | Equipment delivery time of 120 days |
Packaging:
Stable wooden package protects machine from strike and damage.
Wound plastic film keeps machine out of damp and corrosion.
Fumigation-free package helps the smooth customs clearance.
The big size machine will be fixed in container without package.
Shipping:
For LCL, we cooperated with reputable logistics team to send machine to sea port speedily and safely.
For FCL, we get the container and do container loading by our skillful workers carefully.
For forwarders, we have professional and long-term cooperated forwarders who can handle the shipment smoothly. Also we would like
to have seamless cooperation with your forwarder at your convenience.
1. Q: What is the power supply of the machine?
A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.
2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.
5. Q: What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.