Customization: | Available |
---|---|
After-sales Service: | One Year |
Warranty: | One Year, One Year |
Still deciding? Get samples of US$ 500/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The round tube polishing machine is mainly used for rust removal and polishing in hardware manufacturing, vehicle accessories, hydraulic cylinders, instrument machinery, standard parts, and before and after electroplating, from rough polishing to fine polishing at one time.
1.The round tube polishing machine can be installed with various polishing wheels, such as, thousand impellers, hemp wheels, nylon wheels, wool wheels, cloth wheels, PVA, etc.
2.The stepless speed control of the guide wheel is simple and convenient to operate, and the optimized steel structure makes the performance more stable.
3.The reserved fan port can be installed with a dust removal fan.
No | Parameter | Data |
1 | Processing pipe diameter | 1-120mm |
2 | Processing length | 1-120mm |
3 | Spindle speed | 2800r/min |
4 | Feed rate | 0-10m/min |
5 | Polishing wheel power | 3kw |
6 | weight | 320kg |
7 | Dimension | 100*80*100cm |
1. Q: What is the power supply of the machine?
A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.
2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.
5. Q: What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.