|
Still deciding? Get samples of $ !
Request Sample
|
| Customization: | Available |
|---|---|
| After-sales Service: | Provide |
| Applicable Material: | Stainless Steel |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
| No | Description | Data |
| 1 | Motor | 10kw/380V |
| 2 | Oil pump | 40L high-pressure double pump |
| 3 | Hydraulic oil capacity | 150L |
| 4 | Production cycle time | 2 to 3 seconds,2-3 times |
| 5 | Control | Button control panel |
| 6 | Loading method | manual loading and unloading |
| 7 | Tube expansion depth | 80mm |
| 8 | Dimensions (L x W x H): | 2200*1200*1200mm |
| 9 | Weight | 700kg |
1. Wide range of applicable materials: Suitable for SUS304, SUS316, stainless steel welded/seamless pipes, etc.
2. Robust structure: The machine body adopts a thickened welded frame, with strong resistance to deformation, suitable for long-term continuous production.
3. Cold forming: No heating required, fast forming speed, and does not affect the metallographic structure of the material.
Packaging:
1. Stable wooden package protects machine from strike and damage.
2. Wound plastic film keeps machine out of damp and corrosion.
3. Fumigation-free package helps the smooth customs clearance.
4. The big size machine will be fixed in container without package.
Shipping:
For LCL, we cooperated with reputable logistics team to send machine to sea port speedily and safely.
For FCL, we get the container and do container loading by our skillful workers carefully.
For forwarders, we have professional and long-term cooperated forwarders who can handle the shipment smoothly. Also we would like to have seamless cooperation with your forwarder at your convenience.
1. Q: What is the power supply of the machine?
A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.
2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.
5. Q: What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.