Continuous Spiral Screw Blade Auger Flight Cold Rolling Forming Machine For Conveyor
★ Description
The cold-rolled spiral blade machine has changed the traditional method of making spiral blades in the past. The spiral blade forming machine has promoted the development of industrialization. The spiral blade is mainly used in conveying machinery, stirring machinery, and pile drilling machinery, pharmaceutical machinery, environmental protection machinery industry. According to the characteristics of different conveying materials, screw conveyors can be divided into shaftless screw conveying and shafted screw conveying. The cold-rolled spiral blade machine produced by our company can process various specifications of carbon steel spiral blades and stainless steel spiral blades through the conical roller extrusion method precise.
★ Details
★ Processing Effect Display
★ Parameter Main Data
NO. |
Item |
Parameter |
1 |
Model |
SFR-220 |
SFR-320 |
SFR-400 |
2 |
Working mode |
Hydraulic |
3 |
The thickness of rolled strip |
2-6mm |
2-8mm |
2-9mm |
4 |
The width of the strip rolling |
≤130mm |
≤130mm |
≤150mm |
5 |
Inner diameter |
25-90mm |
25-110mm |
30-110mm |
6 |
Outer diameter |
90-270mm |
90-350mm |
90-400mm |
7 |
Pitch of screw thread |
80-230mm |
80-300mm |
80-350mm |
8 |
Rolled speed |
1-6r/min |
1-6r/min |
1-6r/min |
9 |
Main motor working speed |
1440r/min |
1440r/min |
980r/min |
10 |
Main power |
26.5kw |
29.5kw |
34kw |
11 |
Weight |
6t |
6.5t |
8t |
★ Company Information
FAQ
1. Q: What is the power supply of the machine?
A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.
2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.
5. Q: What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.