Customization: | Available |
---|---|
After-sales Service: | Supported |
Automatic Grade: | Full-Automatic |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Spiral tube forming machine BTF-II
Efficient automation: automated production reduces labor and improves efficiency.
Precision molding: cast aluminum mold ensures high precision and meets international standards.
Safe and Reliable: Multiple protection designs ensure safe operation.
Flexible Adaptation: Moulds can be changed to produce various specifications of air ducts.
No. | Description | Data |
1 | Diameter range | 100-1800mm |
2 | Thickness | Galvanized plate: 0.5-1.2mm, width :137mm Stainless steel: 0.45-0.8mm, width of 137mm |
3 | Decoiler | Inner coil diameter:460-520mm Outer coil diameter:1200mm Max load:1100kg |
4 | Production speed | 0-35m/min |
5 | Cut way | Rolling cutting Plasma cutting |
6 | Power system | Shear and turning:pneumatic Feeding roller and clamp: hydraulic |
7 | Power | 16KW |
8 | Weight | 2000KG |
9 | Dimension | Main machine:3.4 x 1.7 x 1.7 m Discharge rack:2.1 x 1.0 x 1.0 m |
Packaging:
Stable wooden package protects machine from strike and damage.1. Q: What is the power supply of the machine?
A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.
2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.
5. Q: What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.