Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 1000/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
PP plastic spiral wrap hydraulic hose protective shrink sleeve extrusion machine
The spiral protective sleeve is made of PP (polypropylene), PE (polyethylene) or PA (nylon) as raw materials, using a spiral protective sleeve production line, and a spiral protective sleeve made by a heat-wound molding extrusion process. Products of different colors and different lengths can be produced according to the actual needs of users. It is a new type of product that replaces traditional metal protection springs for hose protection. Installed on the outside of hydraulic hoses, wires, cables and other products.
No | Parameter | Data |
1 | Screw diameter | Ø65mm |
2 | Aspect ratio | 30:1 |
3 | Extrusion | 50~60Kg/H (Max.) |
4 | Total heating power | 16KW |
5 | Motor Power | 22kw |
6 | Voltage | 380V/50HZ |
1. High degree of automation, saving labor and reducing labor intensity of workers. A production line can be easily operated by only one person.
2. It adopts continuous extrusion method to produce, automatic cut-off at fixed length, automatic unloading or automatic winding.
3. The fixed length can be produced according to needs, and the product can be wound up in coils, the length can reach 200m
1. Q: What is the power supply of the machine?
A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.
2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.
5. Q: What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.