• Industrial Refrigeration Equipment Industrial Water Chiller with CE Certification
  • Industrial Refrigeration Equipment Industrial Water Chiller with CE Certification
  • Industrial Refrigeration Equipment Industrial Water Chiller with CE Certification
  • Industrial Refrigeration Equipment Industrial Water Chiller with CE Certification
  • Industrial Refrigeration Equipment Industrial Water Chiller with CE Certification
  • Industrial Refrigeration Equipment Industrial Water Chiller with CE Certification

Industrial Refrigeration Equipment Industrial Water Chiller with CE Certification

After-sales Service: 1 Year
Type: Water-Cooled
Cooling Method: Water-cooled
Samples:
US$ 5000/Piece 1 Piece(Min.Order)
| Order Sample
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Industrial Refrigeration Equipment Industrial Water Chiller with CE Certification pictures & photos
Industrial Refrigeration Equipment Industrial Water Chiller with CE Certification
US $2,000-5,000 / Piece
Min. Order: 1 Piece
Gold Member Since 2011

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
  • Overview
  • Product Description
  • Detailed Photos
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
BOBO
Certification
CE
Condition
New
Transport Package
Wooden Case
Specification
350kg
Origin
China
Production Capacity
1000sets/Year

Product Description

Product Description

I Features:

The unit adopts 380V, three-phase, four-wire, 50Hz directly grounded AC system, voltage variation range ±5%. The power cables inside the unit shall be arranged according to the national safety standards; Main electrical components should be used in France Schneider, the United States of Bang pu and other international famous brands, the computer control system of the unit according to the change of load, automatically load or unload adjust the output of unit cooling capacity, so that the cooling capacity and the actual cooling and heat load accurately match. Make the compressor always maintain the highest efficiency, high efficiency and energy saving; Compressor start interval time is set to reduce the impact of simultaneous start on the electrical system; The control system adopts the whole Chinese display controller, can realize the remote control, with user level password and factory level password double protection function, more security.

Detailed Photos

Industrial Refrigeration Equipment Industrial Water Chiller with CE CertificationIndustrial Refrigeration Equipment Industrial Water Chiller with CE CertificationIndustrial Refrigeration Equipment Industrial Water Chiller with CE CertificationIndustrial Refrigeration Equipment Industrial Water Chiller with CE Certification

Model BO-10A Unit
The power supply 3-50-380 P-HZ-V
Total power consumed 10.3 kw
Maximum operating current 19.8 A
Refrigerating capacity 28.1 kw
Compressor power 7.5 kw
Condenser fan 1.5 kw
Cooling air volume 10000 m3/h
Refrigerant R407C  
Refrigerant charge 6 kg
The pump power 1.3 kw
The pump flow 5 m3/h
Water tank size 180 L
Size of machine 1430*790*1530 mm
Weight 350 kg
Expansion valve EMERSON America
Filter dryer EMERSON America
Microcomputer controller PUNPU America
The compressor PANASONIC Japan
Packaging & Shipping

Packaging:
Stable wooden package protects machine from strike and damage.
Wound plastic film keeps machine out of damp and corrosion.
Fumigation-free package helps the smooth customs clearance.
The big size machine will be fixed in container without package.

Shipping:
For LCL, we cooperated with reputable logistics team to send machine to sea port speedily and safely.
For FCL, we get the container and do container loading by our skillful workers carefully.
For forwarders, we have professional and long-term cooperated forwarders who can handle the shipment smoothly. Also we would like
to have seamless cooperation with your forwarder at your convenience.

FAQ

1. Q: What is the power supply of the machine?
A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.

2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc

3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc

4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.

5. Q: What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Industrial Refrigeration Equipment Industrial Water Chiller with CE Certification pictures & photos
Industrial Refrigeration Equipment Industrial Water Chiller with CE Certification
US $2,000-5,000 / Piece
Min. Order: 1 Piece
Gold Member Since 2011

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
Number of Employees
16
Year of Establishment
2011-03-04