|
Still deciding? Get samples of $ !
Order Sample
|
| Customization: | Available |
|---|---|
| After-sales Service: | Online Support |
| Automatic Grade: | Full-Automatic |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
| Item | Parameter | |
| 1 | Frame Material | 45# 120*120mm square steel |
| 2 | Applicable Material | Carbon steel strip with thickness 1.0-4.0mm |
| 3 | Processing Range | Inner diameter 200-2000mm, maximum flange size 50*40mm |
| 4 | Dimension | L3200 * W1800 * H1700mm |
| 5 | Weight | 1100KG |
| 6 | Mold Material | SKD61 steel with heat treatment |
| 7 | Mold Hardness | above HRC58 |
| 8 | Total Power | 6KW |
| 9 | Operating Speed | 10-20 holes per minute |
Stable wooden package protects machine from strike and damage.
Wound plastic film keeps machine out of damp and corrosion.
Fumigation-free package helps the smooth customs clearance.
The big size machine will be fixed in container without package.
Shipping:
For LCL, we cooperated with reputable logistics team to send machine to sea port speedily and safely.
For FCL, we get the container and do container loading by our skillful workers carefully.
For forwarders, we have professional and long-term cooperated forwarders who can handle the shipment smoothly. Also we would like
to have seamless cooperation with your forwarder at your convenience.

1. Q: What is the power supply of the machine?
A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.
2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.