Customization: | Available |
---|---|
Type: | High Frequency Brazing Machine |
Max Power: | 50kw |
Still deciding? Get samples of US$ 1000/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
This machine is suitable for pipe joints, brass and copper distributor welding, 5-hole distributors, 14-hole distributors, and 24-hole distributors. The welding equipment can heat two parts at one time and complete the firm connection of the weldment. It is equipped with dual power supplies of 10-60KW and other types.
No | Description | Data |
1 | Max power | 50kw |
2 | Rated power | 30kw |
3 | Max lifting speed | 100mm/s |
4 | Maximum lifting stroke | 200cm |
5 | Lifting accuracy | 0.1mm |
6 | Cooling water flow | 4L/min |
7 | Water pressure | 4-8 bar |
8 | Nitrogen protection |
Independent nitrogen |
9 | Water cooling protection |
Independent water cooling |
10 | Air cooling function | Independent air cooling |
11 | Dimension | 1290*1440*1940mm |
12 | Weight | 300kg |
Packaging:
Stable wooden package protects machine from strike and damage.
Wound plastic film keeps machine out of damp and corrosion.
Fumigation-free package helps the smooth customs clearance.
The big size machine will be fixed in container without package.
Shipping:
For LCL, we cooperated with reputable logistics team to send machine to sea port speedily and safely.
For FCL, we get the container and do container loading by our skillful workers carefully.
For forwarders, we have professional and long-term cooperated forwarders who can handle the shipment smoothly. Also we would like to have seamless cooperation with your forwarder at your convenience.
1. Q: What is the power supply of the machine?
A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.
2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.
5. Q: What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.