• Radiator Copper Tube Heat Pipe Vacuum Degassing Machine
  • Radiator Copper Tube Heat Pipe Vacuum Degassing Machine
  • Radiator Copper Tube Heat Pipe Vacuum Degassing Machine
  • Radiator Copper Tube Heat Pipe Vacuum Degassing Machine
  • Radiator Copper Tube Heat Pipe Vacuum Degassing Machine
  • Radiator Copper Tube Heat Pipe Vacuum Degassing Machine

Radiator Copper Tube Heat Pipe Vacuum Degassing Machine

After-sales Service: 1 Year
Product Length Range: 100~600mm
Neck Length: <45mm
Equipment Capacity: 600~800 PCS/H
Dimensions: 4400mm(L)*1300mm(W)*1800mm(H
Equipment Power: 380V
Samples:
US$ 1000/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2011

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
  • Overview
  • Product Description
  • Product Parameters
  • Product Images
  • FAQ
Overview

Basic Info.

Model NO.
BHP-4

Product Description

Product Description

Radiator copper tube heat pipe vacuum degassing machine
There are 4 stations, including degassing tank, vacuum pipeline, control system, automatic vacuum machine cutting jig (vacuum pump, vacuum gauge not included), 4 groups share a vacuum system. (The master monitor vacuum gauge is attached to monitor the vacuum degree of the vacuum system. The system can only be sealed by time).
Radiator Copper Tube Heat Pipe Vacuum Degassing MachineRadiator Copper Tube Heat Pipe Vacuum Degassing Machine

Product Parameters
  Parameter Data
1 Product length range 100~600mm
2 Neck length <45mm
3 Equipment capacity 600~800 PCS/h
4 Dimensions 4400mm(l)*1300mm(w)*1800mm(h)
5 Equipment power 380V
6 Empty vacuum degree 10-3 Torr
7 Vacuum tank size φ325*1400mm

 

Product Images
Radiator Copper Tube Heat Pipe Vacuum Degassing Machine
Radiator Copper Tube Heat Pipe Vacuum Degassing Machine

 

Radiator Copper Tube Heat Pipe Vacuum Degassing Machine
FAQ

1. Q: What is the power supply of the machine?
A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.

2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc

3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc

4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.

5. Q: What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now