Product Description
1, high power ultrasonic welding machine, suitable for welding larger products.
2, large working table, stable large casting base, production operation does not tilt back, to ensure stable accuracy.
3, adopt precision limit fine tuning, simple operation, high precision.
4, Japan's original piezoelectric ceramic chip transducer, strong and stable output.
5, imported high quality steel horn, strong and durable.
6, four point level adjustable structure, easy to adjust the mold, fast and fast.
7, high quality pneumatic components, to ensure the machine long-term high-precision welding movement.
8, frequency modulation and frequency automatic compensation circuit, effectively protect the circuit and ultrasonic vibration.
Job Characteristics: Fast ---- each welding time 0.01-9.99 seconds, do not need manual handling, non-stop, improve production efficiency. Strength ---- can withstand large tension, high pressure. Quality ---- no water leakage, no air leakage, airtight welding, no damage to plastic parts during welding. Economy ---- no screws, glue. Reduce labor, low cost.
Detailed Photos
Packaging & Shipping
Packaging:
Stable wooden package protects machine from strike and damage.
Wound plastic film keeps machine out of damp and corrosion.
Fumigation-free package helps the smooth customs clearance.
The big size machine will be fixed in container without package.
Shipping:
For LCL, we cooperated with reputable logistics team to send machine to sea port speedily and safely.
For FCL, we get the container and do container loading by our skillful workers carefully.
For forwarders, we have professional and long-term cooperated forwarders who can handle the shipment smoothly. Also we would like
to have seamless cooperation with your forwarder at your convenience.
FAQ
1. Q: What is the power supply of the machine?
A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.
2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.
5. Q: What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.